MezzPro 500kg Mezzanine Goods Lift

4-6 weeks lead time

We’re Here to Help

If you can’t find what you’re looking for, please contact us or call directly +44 (0) 1246 811475

SKU: MEZZPRO

Max Working Load (MWL) 500 kg
Weight 400 kg

Key Features

  • Floor mounted (no pit required)
  • Self-supporting mesh-clad shaft
  • Constant pressure control buttons at both levels
  • Standard travel height of up to 4m (increased height also available)
  • Standard usable platform size of 1300mm x 1300mm
  • Same-side or through-car loading
  • 2 stops (ground plus 1 level)
  • Electrical & mechanical interlocking gates
  • Emergency stop button
  • Anti-slip platform surface

Description

The Penny Engineering MezzPro 500kg Goods Lift is specially designed to handle loads of up to 500kg between 2 or 3 floors in warehouses, factories, stores, and workshops – maximising usable floor space and streamlining operational efficiency.

The MezzPro 500kg goods lift, also known as a trolley lift or roll cage lift, is an opposed mast mechanism that enables users to safely and efficiently transport pallets, trolleys, and roll cages of up to 500kg to secondary storage areas in industrial setups. All our roll cage and trolley lifts are designed and manufactured in the UK with a typical 4-week lead time.

Customers will also benefit from unlimited free site assessments before any project is undertaken, alongside a choice between standard, off-the-shelf models or completely bespoke designs. Optional extras include increased travel height, stops, and platform sizes, as well as outdoor installations and various finish colours.

MezzPro Trolley Lift Uses

The surface-mounted design of a mezzanine trolley lift avoids the costly and time-consuming structural changes required with a pit-fitted installation. Instead, its compact, free-standing build makes our MezzPro 500kg goods lift a simple, effective option for most working environments.

A trolley and roll cage lift from Penny Engineering is ideal for:

  • Loaded pallets of products, materials, or supplies
  • Bulk boxes & crates containing inventory & tools
  • Machinery & equipment
  • Trolley & roll cages
  • Wheelie bins (domestic & commercial)
  • Product deliveries
  • General storage

CE marked and built-in conformance with:

  • Machinery Directive 2006/42/EC
  • Lifting Operations and Lifting Equipment Regulations 1998
  • The Provision and Use of Work Equipment Regulations 1998

Add-Ons/Options

  • Bespoke platform sizes
  • Increased travel height (up to 9m)
  • Increased usable platform size (2000mm x 1000mm)
  • Up to 3 stops (ground plus 2 additional levels)
  • Outdoor installation
  • Choice of finish colour
  • 90-degree loading or additional entrances
  • Trolley stop barriers or gates on platform
  • Solid clad enclosure

Contact Penny Engineering today to discuss your requirements

Why Choose a 500kg Trolley Lift?

Maximise usable space
With a mezzanine floor and the right equipment to help you move goods between levels, you can make the most of the vertical space on your premises.

Versatile
Suitable for numerous applications and load types and with a wide range of optional extras, our trolley lifts can be customised to meet the specific needs of your facility.

Increased safety
Equipped with advanced safety features, including an emergency stop button and anti-slip platform surface, our roll cage lifts protect your personnel and goods.

Boost productivity
By minimising hazardous and time-consuming manual handling processes, our trolley lifts can help speed up the transportation of goods and boost productivity.

User friendly & efficient
Our 500kg goods lifts feature intuitive controls, making it easy for teams to quickly and safely transport goods and enhance overall efficiency across your operations.

Durable & reliable
All Penny Engineering goods lifts are backed by world-class British engineering, with rapid lead times and a UK-wide network of service engineers to deliver on-demand support.

Trolley Lifts from Penny Engineering

At Penny Engineering, we’re dedicated to helping our customers implement health and safety best practices across their operations – designing and manufacturing equipment that is fully compliant with relevant European regulations and industry standards. Using only our in-house engineers, we can carry out UK-wide installations and operator training within as little as 3 working days.

Following setup, we offer a range of planned maintenance programmes, which include statutory thorough examinations. These will be completed by our nationwide network of dedicated service engineers, helping you ensure your roll cage and trolley lift remains safe and operational throughout its life.

500kg Goods Lift FAQs